Haywire Grade Rail/ORV - Part 3

Total Miles 11.4
Technical Rating
2 Easy
Best Time Fall
Trail Type Full-Width Road
Accessible By
Open Trail Map

Trail Overview

This is part 3 of the Haywire Grade Rail/ORV trail. The trail continues on with not only some Michigan history but an amazing ride throughout the upper peninsula. The creeks and fall col are always amazing in the U.P. Of Michigan during the fall. You can end your trip at County road 437 near Steuben if you choose or continue the trip on part 4.

Photos of Haywire Grade Rail/ORV - Part 3

Difficulty

Trail rated a 2 since it can be muddy/Sandy.

Technical Rating

2

Status Reports

Add Status Report
Darren Gage
Aug 24, 2025
Open
Tim Rogers
Aug 15, 2023
Open

Haywire Grade Rail/ORV - Part 3 Trail can be accessed by the following ride types:

  • High Clearance
  • Full Width

Haywire Grade Rail/ORV - Part 3 Map

The onX Offroad Difference

onX Offroad combines trail photos, descriptions, difficulty ratings, width restrictions, seasonality, and more in a user-friendly interface. Available on all devices, with offline access and full compatibility with CarPlay and Android Auto. Discover what you're missing today!

Open Trail Map