Plan with
Confidence
Path Type
Point to Point
Shelby Rail Trail extends the First Broad River Trail. Total, this trail is 2.2 miles in length. The trailhead is located in the middle of the two trails.
To follow the Rail Trail section, begin on the northern end of the parking lot toward the entrance road and head east to follow the gravel and dirt trail. The trail goes behind an industrial area and runs parallel to West Grover Street. The trail ends when it meets back up with West Grover Street.
No Condition Reports
Contributors


