Plan with
Confidence
Seasonal Wildlife Closure from Dec. 1 through May 15.
Path Type
Point to Point
This trail provides access to Sky Mountain Park from the Intercept Lot area and Brush Creek Bike Path. The trail connects with Skyline Ridge trail at its upper end, and intersects with the Airline Trail about 2/3 of the way up.
The trail was built by a combination of volunteers, youth corps, and trail building machines. As such, the character changes a couple times along it's length. Long gently graded climbs are equally fun on the descent. This one is a must-do for both locals and visitors!
No Condition Reports
Contributors

